Central Spine Road – Package Five (5): from Raub to Bentong, Pahang Darul Makmur; (Section Five C (5C) – from Kg. Asap to Kg. Sertik); (Section Five C One (5C1): from CH2000M to CH5775M) and from CH0000M to CH2000M).
Project of East Coast Economic Region (ECER) – Federal Roads, Laluan Eight (8) and Nine (9) – Central Spine Road Package Three (3): from Gua Musang, Kelantan to Kg. Relong, Pahang (Section Three G (3G): Felda Chegar Perah Two (2) – Felda Telang.
Hospital Tuanku Ja’afar, Negeri Sembilan – Construction Works and All Associated Works of Triple Storey Outpatient Centre and Haemodialisys on Part of Lot 4666 at Seremban Hospital Area.
Project of Construction and Completion of Chini College Encompassing an Academy Block, an Administration Block, a Surau, Male and Female Hostels, a Dining Hall, a Health Clinic, a Sports Complex, Thirteen (13) Units of Small and Medium Industrial (IKS) Terrace and Two (2) Units of Linked IKS Terrace in Feldajaya Wilayah Chini, Pekan Pahang.
Project of Construction and Completion of Banting Science Secondary Boarding School on a Plot of Government Land, Jalan Sultan Suleiman Shah, Mukim Bandar, Daerah Kuala Langat, Selangor Darul Ehsan.
Project of Supply, Construction and Completion Works of Three (3) Bungalow Type ‘Ayu’, Twenty Nine (29) Semi-Detached type ‘Baiduri’ Employee Quarters (Encompassing Fifty Eight (58) Units of House) and All Associated Works for Kulai Palm Oil Mill, Johor Darul Takzim.
Design and Build Simpang Pulai – Lojing – Gua Musang – Kuala Berang Highway, Package Six (6): from Aring to Jambatan Pasir Pulau, Terengganu.
28.99-acre Development Project Encompassed Phase One (1) – Three Hundred and Twelve (312) Units of Single-storey Terrace to be Used as Hostels for Students of University College of Engineering and Technology Malaysia) (KUKTEM), Phase Two (2) and Future Development of MEC City, Mukim Kuala Kuantan, Pahang Darul Makmur.
Project of Construction and Completion of an Apartment of Twenty One (21) Storey, One Hundred and Forty (140) Units and Amenities on PTD 57837, Jalan Delima 3/1, Taman Delima, Mukim Tebrau, Daerah Johor Bahru, Johor Darul Takzim.
Project of Construction and Completion of Battalion Training Centre (PLGPT), Land Army Phase II in Gemas, Negeri Sembilan.
Project of Replacement of Existing Asbestos Cement Pipe and Upgrade of Water Reticulation System in Mukim Panchang Bedena, Mukim Sungai Panjang dan Mukim Pasir Panjang di Daerah Sabak Bernam, Selangor Darul Ehsan – Package ‘B’.
Design, Build and Completion of Health Clinic (KK3) Peringgit, Melaka.
Construction and Commissioning of the Seventh (7th) Brigade Complex, Land Army Malaysia on Lot 2976, 27633 and 27634, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim.
Slope Stabilisation and All Associated Road Works in Bukit Fraser, Pahang Darul Makmur – Package II.
Civil Works Project Package 1 for the Kuantan-Kerteh Railway Project – Subcontract for Site Clearance and Earthwork Package 1 – Chainage 0000 to Chainage 16000.
Design and Build Project encompassing Earthworks, Drainage and Infrastructure Works and All Associated Works for Kamsis Universiti Kebangsaan Malaysia, Bangi, Consisting of Eight (8) blocks of Student Hostel, Three (3) Units of Principal Homes on Lot PTD 181, Mukim Kajang, Daerah Ulu Langat, Selangor Darul Ehsan.
Road works in Baru Nilai Selatan (Segment Three (3)) – Demolition, Earthworks, Drainage System and All Associated Works.
External Works for the Design, Construction, Equipping, Commissioning and Maintenance of Malaysian Institute of Chemical Engineering Technology (MICET), Taboh Naning, Melaka.
Project of Realignment and All Associated Works for B15 roads in Putrajaya and Cyberjaya.
Project of Subcontract Works for the Construction of Employee Quarters Encompassing of Seventy Two (72) Units (Type A); Three (3) Blocks, Eighty (80) Units (Type B); Five (5) Blocks, Three Hundred and Forty Eight (348) Units (Type C) and Six (6) Blocks in Gambang, Mukim Kuala Kuantan, Daerah Kuantan, Pahang Darul Makmur.
Project of Earthworks, Drainage System and All Associated Works for Section Five (5) and Six (6) of Industrial Zone and Main Access Road for the Development of Bandar Baru Batu Arang (Parcel A) – Zone B.
Project of Earthworks and All Associated Works for Mixed-Use Development on Government Land (Parcel A), Mukim Bukit Katil and Mukim Bukit Baru, Daerah Melaka Tengah, Melaka (Phase Two (2)).
Project of Earthworks, Drainage System and All Associated Works for Industry Zone Section Five (5) and Six (6) and Main Access Road for the Development of Bandar Baru Batu Arang (Parcel A) – Zone A and C.
Road Upgrading and All Associated Works for Roads from Changlun to Sintok, Kedah Darul Aman.
Project of Construction and Completing of Civil Servant Quarters for Custom, Immigration and Quarantine (CIQ) on part of Lot 1555, Mukim Tanjung Kupang, Johor.
Site Preparation, Earthworks and All Associated Works for the Resettlement Development on Lot 20521, Mukim of Pulai Johor Bahru, Johor.
Site Preparation and All Associated Works for the Playing Field at Petronas Refinery, Mukim Sungai Udang, Melaka.
Project of Site Clerance, Earthworks and All Associated Works for Project Usahasama Perbadanan Setiausaha Kerajaan Negeri Selangor (PSKS) and Intelek Timur Sdn Bhd on Lot 1703, 2103, 2125, 2131, 2134 dan 2143 Mukim of Hulu Langat, Daerah Hulu Langat, Selangor Darul Ehsan.
Project of Site Clearance, Earthworks and All Associated Works on Lot 79, Mukim Sungai Udang, Daerah Melaka Tengah, Melaka.
Project of Earthworks and All Associated Works for the Construction of Mess Pegawai at Prison Headquarters, Kajang, Selangor Darul Ehsan.